黑料福利社

Eliot Substation Construction Project

Eliot Substation Construction Project

Eliot Substation Construction Project

Type:听厂耻产蝉迟补迟颈辞苍
Scope: Performed the greenfeild construction of a 345kV substation.
Location: Eliot, Maine
Client: Eversource Energy

(“Eversource”) provides power to more than 3.6 million electric and natural gas customers in the northeastern United States. In May 2012, Eversource contracted Irby to perform the greenfield construction of a substation near Eliot, Maine in support of its efforts to connect the 345kV Deerfield, Newington, and Maguire Road lines into the Central Maine Power System. Supported by a coalition of Quanta Services companies (Irby, , and are Quanta Services subsidiaries (PWR:NYSE)), the project was delivered on-time, to budget, and without incident in December 2013.

Start Date: May 2012
Completion Date: December 2013

 

 

If you would like to request information on this project or submit a request for bid,听click here.

 

Patent Gate 345/115kV Substation Construction Project

Patent Gate 345/115kV Substation Construction Project

Patent Gate 345/115kV Substation Construction Project

Type:听厂耻产蝉迟补迟颈辞苍
Scope: Performed the greenfield construction of a 345/115kV substation including foundations, steel structures, and electrical bus work.
Location: Arnegard, North Dakota
Client: Basin Electric Power Cooperative

 

(“BEPC”) is a consumer-owned wholesale electric generation and transmission cooperative based in North Dakota which serves approximately 2.9 million customers across nine U.S. states.

BEPC contracted Irby in August 2015 to construct its 345/115kV Patent Gate substation near Arnegard, North Dakota as part of its Antelope Valley Station to Neset Transmission Project. Supported by BEPC engineering, Irby self-performed all foundation, structural steel, and electrical bus work; and energized the new 345 kV switchyard in November 2016.

Start Date: August 2015
Completion Date: December 2016

 

If you would like to request information on this project or submit a request for bid,听click here.

 

The Southern Loop 345kV Transmission Line Construction Project

The Southern Loop 345kV Transmission Line Construction Project

The Southern Loop 345kV Transmission Line Construction Project

Type: Transmission
Scope: Constructed 53 miles of 345kV transmission line including the relocation of existing 345kV and 115kV interconnection line.
Location: Vermont, USA
Client: Vermont Transco

owns and manages Vermont’s high-voltage electric transmission system (115 kV and above) and provides service to Vermont鈥檚 17 electric distribution utilities and utilities in New Hampshire and New England.

In October 2010, Vermont Transco contracted Construction to build 53 miles of 345kV transmission line including the relocation of existing 345kV and 115kV interconnection line as part of the Southern Loop transmission line project.

As subcontracted to Cianbro Construction the Irby work scope included the direct embed of wood H-frame structures, steel monopole structures on anchor bolt foundations, twin bundled conductor, and two static lines in mountainous terrain. The project was completed on schedule and with zero lost time incidents in October 2010.

Start Date: February 2010
Completion Date: October 2010

 

 

If you would like to request information on this project or submit a request for bid,听click here.

 

Thomson-Vogtle 500kV Transmission Line Construction Project

Thomson-Vogtle 500kV Transmission Line Construction Project

Thomson-Vogtle 500kV Transmission Line Construction Project

Type: Transmission
Scope: Constructed 47.08 miles of 500kV transmission line in support of two nuclear power plant sites.
Location: Augusta, Georgia
Client: Georgia Power Company

The (“GPC”) (a subsidiary of ) provides electricity to over 2.3 million customers in 155 of Georgia’s 159 counties.

In July 2015, GPC contracted Irby to construct 47 miles of 500kV transmission line along existing right-of-way to further the capacity of its expanding nuclear infrastructure. Beginning at in Waynesboro and ending at the Thomson Primary substation, construction of the transmission line was completed and energized in April 2017 in anticipation of two new nuclear units at the Vogtle site.

The units will generate enough emission-free electricity to power approximately 500,000 homes and businesses.

Learn more at the .

Start Date: July 2015
Completion Date: April 2017

 

If you would like to request information on this project or submit a request for bid,听click here.

 

Horse Hollow-Kendall 345kV Transmission Line Construction Project

Horse Hollow-Kendall 345kV Transmission Line Construction Project

Horse Hollow-Kendall 345kV Transmission Line Construction Project

Type:听Renewables, Transmission
Scope: Constructed 235 miles of 345kV and 12 miles of 138kV transmission line in support of a wind farm project in Southcentral Texas.
Location: Brady, Texas
Client: Horse Hollow Generation Tie

Horse Hollow Wind Energy Center (“HHWEC”) is a ~47,000 acre 735.5 MW wind farm situated in Taylor and Nolan Counties, Texas. Built, owned, and operated by (“NextEra”) (via its subsidiaries including Horse Hollow Generation Tie, LLC), the project’s 421 turbines are capable of generating enough electricity to power more than 220,600 homes.

In April 2009, Irby was contracted to construct 235 miles of 345kV and 12 miles of 138kV transmission line to deliver power from HHWEC to NextEra’s customers in the San Antonio area. Completed ahead of schedule and without incident, Irby acted as the prime contractor for the project on behalf of a consortium of Quanta Services (PWR:NYSE) subsidiary companies including , Dillard Smith, , and .

In addition to the transmission lines, Irby crews also installed over 600 concrete, steel ,and hybrid poles, and strung over 90 miles of bundle conductor for the project. The project was delivered on time and to budget in April 2010.

Start Date: April 2009
Completion Date: April 2010

 

If you would like to request information on this project or submit a request for bid,听click here.